When the Maintenance Vendor Changes: Deployment Assets the Agency Must Take Over

A file list from the outgoing vendor says what you received, not what you can keep running. A handover list built backwards from the new team's tasks, the order for switching access, and an acceptance test that separates redeploying an old release from rebuilding it.

John Baek
John Baek
Founder, CollabOps
2 min read

Friday afternoon, the outgoing maintenance vendor hands over the source repository and the operations manual. Monday morning, the new engineer tries to put last month's release back on the test network. The source opens. But the libraries the build needs live in the old vendor's internal package repository, the WAR that ran in production has expired, and the deployment history is visible only under the account of someone who has left. A file list tells you what you received. Whether you can keep operating it, you only learn by deploying once.

The acceptance bar for a vendor handover is not the list of files received. It is whether the new team, using agency-issued accounts, can redeploy a past release and roll it back.

How do you write a handover list that misses nothing?

Write it backwards from what the next engineer has to do.

What the new engineer has to doAssets to take over
Find the source for the last releaseA repository the agency can access, release tags and commits, linked change requests
Build in a clean environmentBuild definition, JDK and tool versions, pinned dependencies, a reachable package repository
Redeploy the existing versionThe files actually deployed and their digests, per-environment deployment config, startup and recovery procedures
Work with the right permissionsA role-based permission table, agency-owned account issuing and revocation procedures, owners for service accounts and keys
Explain why that version is in productionReason for the change, verification and approval history, per-target execution results, open exceptions

In what order should accounts and access change hands?

New access gets verified first, and the old vendor's access is revoked after. Issue the new engineer's permissions through an agency-owned procedure, and confirm the needed tasks work on the test network first. Then revoke the old vendor's accounts and tokens while keeping the identity records of who approved and executed things in the past. If the contract includes third-party software, mark per asset under what terms the new contractor can keep building, using and maintaining it.

Why test redeploy and rebuild separately?

Pick one past release in the acceptance test and ask for two results. First, fetch the archived original file, verify its digest and deploy it to the test network. Second, rebuild from the same commit and build definition in a fresh workspace. If the contract requires an identical binary, compare the new artifact to the original byte for byte (see the definition of reproducible builds). Successfully redeploying the existing file and recreating that same file from source are two different acceptance outcomes. Keeping original files from expiring by setting retention separately is covered in setting separate retention for build logs, artifacts and audit records.

chosen release v (tag and commit)
 ├─ ① archived original WAR ─▶ digest check ─▶ deploy to test ─▶ business request check = can redeploy
 └─ ② same commit + build definition ─▶ fresh-workspace build ─▶ (if contracted) byte compare = can rebuild

The final signature is best given by the new engineer: "Using an agency-issued account, I found the release, applied it to the test network, confirmed one business request, and rolled back to the previous version." If that sentence comes with run numbers, it's clear from the day after handover who is carrying operations forward.

  • #public-sector
  • #migration
  • #supply-chain
  • #traceability
  • #deployment