Subtasks, Related Issues and Blockers in One Release

Four issues with the same tag are easy to search, but when an external approval slips they do not tell you what to postpone. Using one login redesign, we separate subtasks that set scope, blockers that set order, and related issues that record why.

John Baek
John Baek
Founder, CollabOps
2 min read

A login redesign produced four pieces of work. Fix the login screen, run integration testing against the production identity system, register a new callback URL with the external identity provider, and update the login screenshots in the help pages. All four issues got a login-redesign tag. Search works fine. But when the callback registration slips by two days, it's still hard to tell which work should be pushed back.

A tag groups issues; it does not describe how they relate. To know what to reschedule on the day something slips, you need to record three kinds of relationship separately: scope, order and reference.

How do you draw the four issues on a board?

Use a different kind of line for scope, order and reference. Draw the relationships on the board like this. (The case is illustrative.)

[Login redesign]
   ├─(subtask)─▶ [Fix login screen] ┄┄(related)┄┄ [Update login FAQ]
   └─(subtask)─▶ [Production integration test]
                        ▲
                        │ (blocks the test)
              [Approve production callback URL]

What does each relationship decide?

A subtask decides scope. For this release, "login redesign" covers the screen fix and the production integration test. When the screen fix is done, the parent issue shows 1/2 subtasks done. You can say exactly what's left before the redesign is finished.

A blocker decides order. Until the new callback URL is approved, you can't fully test whether a user who finishes production authentication lands back on the new screen. If approval slips two days, the integration test and the release date move with it. Meanwhile the developer can keep working on the screen against mocked auth responses. Blocking has a direction, so the UI should read that way: Production integration test is waiting on callback URL approval. GitHub's issue dependencies also distinguish blocking from blocked by.

A related issue records a reason to look together. The FAQ owner, connected by the dotted line, will take new screenshots once the login copy is final. For this release the team agreed the FAQ can be updated later. If the next contract makes help-page delivery part of acceptance, that's when the FAQ becomes a blocker of the acceptance test.

If external approval slips two days, whose schedule changes?

Here, only the production integration test moves. A slipped date is exactly when you find out whether relationships were recorded properly. The program owner reschedules the integration test, tells the screen developer to keep going, and lets the FAQ owner know when the final copy will be ready to capture.

Deciding whether one remaining issue blocks the launch itself is covered in Nine of ten issues are done. Is the milestone 90% done?