Should an Empty Project's First Button Be "Create Issue" or "Connect Repository"?
"Finish setting up your project" tells nobody what to do first. Splitting the first five minutes of a planning team and a deployment team to choose each first button and its copy, and changing the next step based on why a list is empty.
A program owner logging in for the first time wants to share Friday's acceptance review date. A deployment engineer logging in the same day wants to get the existing booking API ready for staging. Both opened a new project, and both screens are empty. A banner saying Finish setting up your project gives neither of them a first move.
An empty screen's first button should come from the result the team wants to walk away with on day one. For a planning team that's a first issue to share; for a deployment team it's a connected repository and a first deploy candidate.
How do the first five minutes differ for a planning team and a deployment team?
The planning team starts by creating a first issue and sharing it on the calendar. The deployment team starts by connecting an existing repository and checking for a first deploy candidate. (Copy and cases are design examples.)
First five minutes of a planning project. The empty screen says "No work items yet. Add your nearest review date." with a Create first issue button. The owner types Acceptance review: application screen, assigns a reviewer and sets a Friday deadline. After saving, the calendar shows the review in Friday's cell. That's the screen they wanted to show colleagues in the meeting.
First five minutes of a deployment project. For a team that already has a repository, the prompt starts with "Connect the repository that holds the code you'll deploy." The first button is Connect existing repository. The engineer picks booking-api from the list they can access. The next screen shows whether staging can be selected as a target and whether this repository has a verified build. If it does, they review the first deploy candidate; if not, the next action is Run first build. Either way, they can explain how far along they are.
The copy changes with the reason a list is empty
Why a list is empty changes the copy too. If the project has ten issues but the Assigned to me filter returns zero, the right action is Clear filters. For an engineer without permission to connect, it's Request connect permission. Emphasizing Create new on screens like these leads people to register work or repositories that already exist. The empty states pattern in the Carbon Design System likewise recommends explaining why a screen is empty along with what you can do from there.
How do you measure whether a first screen did its job?
To measure a first screen, go one step past the number of projects created. For the planning team, time it until a first issue with an owner and a deadline is shared with a colleague. For the deployment team, time it until an existing repository is connected and a first deploy candidate or the needed build is confirmed. Which button to start from is decided by what the team wants to take away on day one.
Which dates that first issue should carry is covered in Should every issue have a start date and an end date?