Already Running Jira, Bamboo and GitLab? What to Connect First

For a team that already uses all three tools, the first integration only needs to answer one question: which build did the fix land in, and is that build in production? Four rows that tie an issue, a merge commit, a build number and a production check together, plus how to measure the effect.

John Baek
John Baek
Founder, CollabOps
2 min read

Monday morning, support pings engineering: "The bug where a cancelled booking stayed on the waitlist. Is it fixed now?" The Jira issue was closed on Friday. GitLab has the merged code, and the Bamboo build is green. Still, nobody can answer "yes" right away, because someone has to ask again: which build did the fix go into, and did that build reach production?

For a team already running these three tools, the first integration should be scoped to one question: is this fix running in the environment customers use right now?

How do you scope the integration with one issue from last week?

Take that question as the scope. Pick one issue from last week and fill in four rows. (Issue numbers and deploy history are illustrative.)

Fact to establishSource of recordExample
What problem was fixedJira issueBOOK-247 · cancelled booking stays on waitlist
What code landedGitLab merge request and final commitbooking-api !52 · merge commit a18d6b2
What was builtBamboo plan and run numberBOOK-API-219 built that commit
What the customer-facing environment runsProduction deploy record and target checkFriday: production on 218. After Monday's morning deploy, both instances on 219

On Friday, the correct answer from this table is "the fix is merged and built, production rollout is pending." On Monday, the check on both production instances lets you change that answer. No developer has to reopen the Jira issue, and support never needs production server access.

The first two links (issue to code, code to build) can mostly be built with what the tools already offer. With the GitLab Jira integration configured, commits and merge requests can reference issue keys. Bamboo, when connected to Jira, links builds to issues through issue keys in commit messages and similar fields.

The value to hold on to is the commit Bamboo actually built. When several changes were merged, or the same commit was rebuilt, a branch name or the latest build number won't pin down what was shipped. The gap is the fourth row. You need a record connecting the build number to the version observed on the production targets, and that record is what separates Friday's answer from Monday's.

How do you measure whether the first integration helped?

Measure it on a handful of similar support questions. Compare, before and after, how long it took to find the answer, how many times someone had to ask another team, and how many cases ended without a confirmed answer on whether the fix was live.

Connecting deploy records can start independently of any SCM replacement (If we replace our SCM, does deployment come along?). If the team keeps all three tools and can now tell Friday's answer from Monday's, the value of that first step is already easy to explain.

  • #integration
  • #traceability
  • #cicd
  • #git
  • #adoption