Where to Resume When an Air-Gapped Install Stops Halfway
An installer stuck at 72% does not tell you what to do next. How to re-verify completion on the target systems for image import, database migration and service startup, and why the moment right after a DB commit is the stop point worth putting in your acceptance test.
The installer froze at 72%. The last line reads Updating database. Maybe the installer died just before the database committed its change. Maybe the database finished and the connection dropped before the installer could record success. The screen looks identical in both cases, and what you do next is different.
Where to resume an install is decided by the state actually left on the target systems, not by the installer's progress bar. Re-read the registry, the database and the workloads, and the next step becomes clear.
For each stage, where do you re-check?
To resume, the progress figure needs a companion: where you can re-verify whether the stage finished.
| Interrupted stage | Where to check on restart | Next action based on what you find |
|---|---|---|
| Importing 20 images | Image digests in the internal registry and layers for the target platform | If 18 verified images are present, import only the 2 missing or damaged ones and pull them onto the target nodes. |
| Database migration | Migration history, checksums, and actual table and index state in the target DB | If the expected version applied cleanly, move on. If it applied partially, repair that gap first. |
| Service startup | Deployed release version, workload readiness, a project lookup | If processes are up but the lookup fails, keep checking that service and its dependencies. |
Say the installer's last record shows DB version 11, but the target database has a successful version 12 entry and every expected index. Then you resume at service startup. If instead the index exists but a backfill of existing data stopped midway, you need to find the last range it processed. Flyway's migration history and checksums are one way to re-identify applied changes. Kubernetes init containers can also run more than once, so plan for the same input being processed repeatedly.
In the handover note, instead of 72% complete, you can write "Package version matches target cluster, 20/20 images verified, DB version 12 confirmed, resume from API startup." If the install bundle or target database has changed, that difference surfaces before you apply the old progress record.
Where should the acceptance test cut the install?
The most informative stop point is right after the database commits its change and right before the installer records completion. If reopening the installer from there doesn't duplicate the DB change or the initial admin account, and you reach the first project lookup, you have a resume procedure the on-site engineer can actually use.
What if the install completes but the first build stops?
There's a separate class of failure where the install completes and the first build still stops. The items most often missing from the import list are in why an air-gapped install fails even with every image and Helm chart.