Will Hiring More Senior Engineers Actually Make the Team Faster?

Expecting a team to speed up after hiring experienced engineers is natural. But there is something to check before opening the role: can you describe why work is slow as a concrete scene? Notes on separating work time from elapsed time, writing down the expected outcome, and how to judge a senior hire.

John Baek
John Baek
Founder, CollabOps
Will Hiring More Senior Engineers Actually Make the Team Faster?

Every team goes through a stretch where its speed falls short of expectations. The first remedy that comes to mind is hiring more experienced engineers. Someone who grasps complex problems quickly, leads the design, and helps the rest of the team grow. I have that expectation every time I think about team composition. So I settled on a question to ask myself before opening a role: which problem am I expecting a senior hire to solve?

What problem does a senior hire actually solve?

There are moments that clearly call for experience. Narrowing down the cause of a production incident, designing a permission model, carrying a change across several services safely. If nobody on the team can take that on, securing the capability is the top priority, full stop. As I wrote in the first nine months, choosing someone with real technical depth as the second member was the decision that got us through the first PoC.

But before deciding to hire, there is something I want to confirm. Can I describe why work is slow right now as a specific scene? "The team lacks execution" is a sentence that does not even tell you what kind of person to bring in.

How do you diagnose why a team is slow?

Follow a few recently completed pieces of work from start to finish. What was waited on before starting, where implementation got stuck, how long it sat in review, what had to be redone after it was called done. Before evaluating people, understand the conditions under which the work moved.

The same "slow" looks different up close.

  • If implementation itself keeps stalling, and with nobody to own technical judgment several people investigate the same problem over and over, you can suspect a gap in experience.
  • If work often gets rebuilt because the goal changed after implementation finished, a new engineer will hit the same rework. Fixing how requirements are set comes before hiring.
  • If priorities and customer needs live in one person's head and everyone waits on decisions, more people means more questions. Unless you decide which decisions move to the team along with the hire, headcount grows and the decision flow stays exactly where it was.

All three scenes are slow. The remedy for each is different.

Why separate work time from elapsed time?

Because if implementation took a day and completion took a week, the other six days are most likely not an implementation-skill problem. Waiting for review, waiting for a decision, waiting for an environment. A senior hire does not shrink that time.

Conversely, if nobody was kept waiting and the same kind of technical mistake keeps recurring, then skill and verification practice deserve a look. Neither conclusion can be reached up front. You have to actually trace the flow of the work. This distinction overlaps, as it happens, with the problem our product deals with: when the record shows where a change sat and for how long, this diagnosis can be done from data rather than from gut feel.

How should the expected outcome of a senior hire be written?

As a result that has to change, not as a title. Should design review stop concentrating on one person? Should the root cause of a recurring operational problem be found and fixed? Should other engineers become able to finish the same kind of work on their own? Only when the expected outcome is concrete can a candidate's experience be read against it.

The authority to produce that outcome has to be written down too. Bring someone in to improve the structure and then give them no room to adjust schedule or scope, and the expectations collide. What can they change, which decisions are shared, and how will the team make time to absorb the change? That is part of hiring as well.

How should a senior engineer's performance be judged?

By how the work around them changed, alongside what they handled alone.

  • Did review criteria get written down?
  • When the same problem comes back, can someone else now make the call?
  • Is critical knowledge accumulating in only one person?

The impact expected of a senior engineer is not their throughput. It is the widening of the team's ability to judge. Without that standard, the most experienced person tends to drift into being the busiest bottleneck.

Once you know which capability is missing, go get it. Alongside that, the leader has to sort out priorities and the organization has to change the processes that need changing. Creating the conditions under which the new person can actually use their skills is the hiring side's responsibility.

What sentence has to be finished before hiring?

The two that come after "we need a senior engineer." When this person joins, what has to be different from today? And what will we change so that difference becomes possible? When both can be answered, the role gets opened. When they cannot, that is a signal that something other than hiring comes first.

Tags#founder-notes#hiring#engineering-management#team-velocity#senior-engineers#startup