First Nine Months of CollabOps — *23 Decisions* From Zero to First Customer

Nine months of founding. People, money, product, market — 23 decisions. *Seven* clearly right, *six* clearly wrong, *the rest* still unknown. An honest record.

John Baek
John Baek
Founder, CollabOps
First Nine Months of CollabOps — *23 Decisions* From Zero to First Customer

I wrote down the decisions of CollabOps's first nine months. Came out to 23. From here, seven look clearly right, six clearly wrong, and the remaining ten still don't have an answer.

This post is the honest taxonomy. A raw record of what kinds of decisions fill a startup founder's first nine months.

Seven decisions clearly right

1. Picking on-prem / air-gapped market as the ICP

The decision between global SaaS DevOps vs Korean / Japanese / EU air-gapped. The latter looked smaller, but matched our technical strength and capital efficiency. → Why we default to self-hosted

2. Technical PhD as the second hire

More valuable in the first six months than sales / product / ops. 80% of our first PoC passes hinged on his depth.

3. Blog as the first sales asset

Cold email, ads, BD outsourcing — all inefficient. Blog → meeting → PoC was the most efficient path (→ Enterprise sales without BD).

4. PoC as the CTA

Pitched a 2-week PoC instead of a demo after the first meeting. Higher entry bar. The people who entered were serious. 17% conversion.

5. Self-hosted-first

Did not start SaaS-first. Adding self-hosted six months later is nearly impossible. The first decision creates the option for the next five years.

6. Korean + English from the start

Started Korean only. Three months in we added English. English traffic is 5× Korean — global LLM answers are predominantly English.

7. Permission model on a graph from day one

Explicitly rejected the option of RBAC now, graph later. Graph from day one. Six months later, AI agent integration required zero additional work. → Permission model on a graph

Six decisions clearly wrong

1. Trying cold email campaigns

300 sent, 1 meeting, 0 contracts. Three months wasted.

2. Outsourcing BD

Three months. 17 MQLs. Zero matched our ICP.

3. One-time conference booth

$12,000. 47 cards. 1 meeting. Booth < talk.

4. Advertising SaaS as an option in the first six months

Self-hosted is default — but we put "also available as SaaS" on sales material. Diluted the message. Switched to self-hosted only in marketing six months in.

5. Hiring the first designer too late

Designer joined six months after the first engineer. During those six months, weak UI got us rejected from two customer meetings. Should have hired earlier.

6. Too many features — eight at first launch

Lost focus. Took three additional months to cut down to four. Should have started with four.

Ten decisions still unanswered

Made now, but right or wrong still unknown. The answers will come at 12–24 months.

  1. First fundraising timing — now vs six months later
  2. FIPS adoption — six months for one customer → FIPS compliance cost
  3. Eight-month AI agent beta — held the launch
  4. Monorepo vs polyrepo — chose monorepo
  5. Built our own workflow expression engineWhy we built our own expression engine
  6. Sales:engineering ratio — held at 1:5
  7. Global vs Korea-first market attack — Korea + Japan
  8. Open-sourcing parts — kept core closed, expression engine open
  9. Quarterly conference talk cadence — sustainability unknown
  10. Splitting the blog across team bylines vs a single founder voice — eventually consolidated to the latter (this very post is the result)

Nine months in one line

Whether 23 decisions are right or wrong depends on the vantage point of right now. A year from now the taxonomy may shift.

What's certain — there were 23 decisions. Nine months = 23 decisions = 0.6 per week. Sounds small, but each decision shapes the environment for the next. Compounding.

Should you copy these 23 decisions?

No — CollabOps's 23 decisions over nine months are reference material, not answers that transplant to another company. If you're a founder starting from zero and standing at a similar fork on any of the 23, our decision + nine-month evaluation is worth reading. But our ICP doesn't guarantee correctness for yours — simulate against your own first.

Next entry

Plan to rewrite this post nine months from now (2026-12). By then, the unanswered ten will have settled into right or wrong.

Tags#founder-notes#startup#decisions#hiring#first-customer